PRODUCTION WELLS (WEST AREA)



 

Production Well No.10A

 

Production Well No.14
Location: Balongis, Balulang
Capacity: 1266 gpm
Date Drilled : 4/14/1994

 

Production Well No. 15
Location: PN Roa Subd.,Calaanan, Canitoan
Capacity: 421 gpm
Date Drilled : 4/21/1994

 

Production Well No.17
Location: Balongis, Balulang
Capacity: 614 gpm
Date Drilled : 3/21/199