Production Well No.10A
Production Well No.14 Location: Balongis, Balulang Capacity: 1266 gpm Date Drilled : 4/14/1994
Production Well No. 15 Location: PN Roa Subd.,Calaanan, Canitoan Capacity: 421 gpm Date Drilled : 4/21/1994
Production Well No.17 Location: Balongis, Balulang Capacity: 614 gpm Date Drilled : 3/21/199